Call Us: +261 34 05 671 41
Step inside the completed projects that turned the need for clean water into lasting community impact.
This page is a new addition to our communication. I love what we are doing and like to share it with those who have a similar interest, many of whom are financing the work. This page shows the work we are doing today, as we speak. The projects come from our inventory and will eventually move to our list of accomplishments or learnings.

Madagascar is a large country, an island measuring about 1000 miles long and 300 miles wide. Geographically, it is dominated by a large central plateau, which has an average elevation of 4000 feet, and coastal lowlands. Madagascar is about 20 degrees south of the equator and is no more tropical than my home on the US Gulf Coast. Most of the country receives adequate rain, although it tends to be more seasonal. Southern Madagascar, however, has low rainfall in the best years and much less in the decades-long drought that now dominates the region.
A Water Crisis in the South
Some organizations consider southern Madagascar to be a disaster area. In many areas, access to water is completely lacking. This in turn affects agriculture and results in very widespread malnutrition, some of it progressing to visible starvation. By most accounts, the situation is dire. The report available with the button below describes our observations and assessment made during a trip in 2020.

The Madagascar Water Project (MWP) began drilling water wells along the East coast of Madagascar in 2015. The MWP serves small, rural villages lacking any infrastructure and most services such as schools and medical facilities. Most of the East Coast villages are accessible only by the Pangalana Channel, a freshwater intracoastal waterway that also serves as their only source of water. Water-borne diseases are common, including dysentery, diarrhea, and schistosomiasis, aka Bilharzia, which is carried by snails.
Creating Water Security
The MWP has drilled 157 shallow wells (less than 23 feet) that provide water to about 80,000 people. Sustainability is ensured by encouraging local participation through the formation of well-managed committees and training local technicians to perform routine maintenance and repairs. With the continued support of the MWP, periodic visits include maintenance and repairs when needed. Out of the 157 wells, 122 are still producing, and most are self-sustaining.

The Madagascar Water Project rebuilt the Marolambo Municipal Water System in October 2023. The entire system had deteriorated over the decades, diminishing its ability to provide safe water to the community of 7800 people. Water was sourced from a surface stream 3 km outside the village, but multiple water analyses indicated it had significant levels of E. coli and was not suitable to drink without chlorination. Logistics, road access to Marolambo, was a significant challenge and was the likely reason the village has been passed over by every other water project done in the region.
Upstream, the MWP rebuilt the dam and filtration system. Two 45k liter holding tanks were refurbished, and a chlorination system was added. The distribution system was completely rebuilt. It included 7000 meters of pipeline, 20 double spigot water kiosks for public use, and 10 water stands located in churches, schools, clinics, and government facilities. The total project cost was MGA 300M ($70k USD), required about 5 man-years of work, and took 45 days to complete.
At the conclusion of construction, the MWP hired two technicians to provide daily on-site chlorination, weekly water testing, and provide maintenance & repairs to the dam and the water filtration and distribution systems. Their work will ensure the long-term sustainability of the water system.
Several relevant reports can be accessed through the attached links.

Ampitakihosy is our first integrated mini-municipal water development project. A village of 2000, it had only one open bucket well with a hand pump to provide “clean water." The rest came from rice fields in the adjacent lowlands. The MWP drilled one well in the village and found only a minimal aquifer. The second well found an 8-meter-deep, high-quality fresh water aquifer, which tested at more than 3k liters/hour – capable of providing water to the entire village.
The MWP designed a water production and distribution system using the following:
Much of the labor will be provided free of charge by the village. The project is expected to take 30 – 45 days and cost an incremental $10k to build.
Once operational, a technician will be hired to provide maintenance, management, repairs, and chlorination services. Like all our projects, the MWP will maintain a presence and relationship with the village to ensure the long-term sustainability of the project.
Three new wells were drilled last month. All were completed with Indian Mark III hand pumps. The well in Miakara, a village of 1500, is slated to be used as a source well for our next mini-municipal water system. It tested at a rate of 3k liters/hour with fresh, sweet water. Three existing wells in the village, all much shallower than the MWP well, are not used because they have a high-iron, sulfur-like taste.




We have an aggressive drilling program in the Mahanoro area. It is a combination of individual water wells in smaller villages and potential source wells in larger villages if a water distribution system is justifiable and supported financially.
Up to 13 new wells will be drilled in the next 6 – 8 weeks, all completed with hand pumps. As the aerial photo to the right shows, there is no shortage of villages in need.
The Madagascar Water Project has been working in the Betroka District of Southern Madagascar since 2021. Drilling new wells is difficult and geologically risky because the geology is dominated by basaltic lava flows. It is incredibly hard, and pockets of water found in fractures are few and far between. There are, however, hundreds or eve
The Madagascar Water Project has been working in the Betroka District of Southern Madagascar since 2021. Drilling new wells is difficult and geologically risky because the geology is dominated by basaltic lava flows. It is incredibly hard, and pockets of water found in fractures are few and far between. There are, however, hundreds or even thousands of water wells drilled over the past decades that have fallen into disrepair. Most have been stripped for parts, but records available in the local government office have provided the exact location of many hundreds.
With assistance from the communes, the Madagascar Water Project has used these records to locate old abandoned wells and repair them. Most wells require a drilling rig to clean out debris in the casing. Some require old tubing and other hardware to be recovered from the well before it is flow-tested and a new replacement Indian Mark III pump is installed.
Rehabilitated wells, which have an average depth of 25 - 40 meters, provide clean water for drinking, cooking, and many other activities that improve the health, hygiene, and sanitation needs of the local population. They are also used to irrigate their crops using water cans. There are no alternatives to these wells, so most serve populations of more than 1000 people.
Projects in the south are moderate-cost, very high-impact endeavors. The number of wells to be rehabilitated is unlimited. The Madagascar Water Project has already rehabilitated 26 wells and will remain in the region for the foreseeable future.

The Madagascar Water Project drilled two wells in Ampiatikosy in March 2024. One well was a relatively low producer, and the other produced 3k liters per hour from a high-quality aquifer. The only other well in the village of 2000 was a shallow bucket well.
Connecting Communities to Water
Due to the high geologic risk for additional wells, the MWP designed a mini municipal water system with 8 water stands, using the high-rate well as a source. It will require 2500 meters of pipeline and a large containment tank.
Estimated incremental costs for the water distribution system are $10k, and it will take approximately one month to build. The plan is shown in the photo.
The Madagascar Water Project
Bringing sustainable clean water to rural communities across Madagascar.
Phone: +261 34 05 671 41 | Business Hours: Open 24
Email Us: themadagascarwaterproject@gmail.com
Copyright © 2026, The Madagascar Water Project. All Rights Reserved.
We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.